2 Replies to “Election Results: May Municipal Election”

  1. Thank you for all the updates about the flashing beacons at the pedestrian crosswalks and the preliminary results of the Municipal election.
    Is there any chance that the pothole on the south side (the firehouse side) of the road to the State Street bridge from West Englewood Avenue can be repaired, please? Thank you in advance.

    1. Windsor should be milled in 2-3 weeks. They are doing all concrete work now.

      Shortly after that, repaving of the entire length of Windsor Road will commence.

Comments are closed.